15kV 200AMP Loadbreak Elbow Connector

15kV 200A Loadbreak Elbow connector is a fully-shielded and insulated plug-in termination, rated 200A, 15kV, connected with underground cable ranging from 25mm² to 150 mm² (conductor cross section). It’s loadbreak probe with an ablative arc-follower tip provides dependable loadbreak switching characteristics. The Loadbreak Elbows are molded with high quality peroxide-cured EPDM insulation. It is used to connect underground cable to transformers, switchgear and 200A junctions equipped with loadbreak bushings. The test point is available with hot line voltage indicators.

SKU: UG LE-15/200 Category: Tags: , , ,
Description

15kV 200A Loadbreak Elbow connector is a fully-shielded and insulated plug-in termination, rated 200A, 15kV, connected with underground cable ranging from 25mm² to 150 mm² (conductor cross section). It’s loadbreak probe with an ablative arc-follower tip provides dependable loadbreak switching characteristics. The Loadbreak Elbows are molded with high quality peroxide-cured EPDM insulation. It is used to connect underground cable to transformers, switchgear and 200A junctions equipped with loadbreak bushings. The test point is available with hot line voltage indicators.

 

Order Information
Reference No. Conductor Cross Section (mm²) Stretch Range Over Insulation(mm) Corresponding Code
UG LE-15/200-35 35 16.3-23.1 A
UG LE-15/200-50 50 16.3-23.1 A
UG LE-15/200-70 70 19.1-25.7 B
UG LE-15/200-95 95 21.3-28.2 C
UG LE-15/200-120 120 21.3-28.2 C
UG LE-15/200-150 150 21.3-28.2 C

– The cable range is the basic element for choosing the product’s type.

– The conductor size is just for a reference.

 

Electrical Characteristics
Voltage Rating 15kV
Maximum Rating Phase-to-phase 14.4kV
Maximum Rating Phase-to-ground 8.3kV
AC 50Hz 1 Minute Withstand 34kV
DC 15 Minute Withstand 53kV
BIL and 1.5 / 50µs Impulse Withstand Voltage 95kV
Partial Discharge Voltage 11kV ( <3pC)
Continuous Current 200A
Switching Current 10 operations at 200A, 14.4kV
Fault Closure 10kA
Short Time 10kA rms sym. For 0.17s (60Hz) / 0.2s (50Hz) 3.5kA rms sym. for 3.0s
Meets ANSI / IEEE 386, latest version. Mate with bushing interface figure 5.
Bom

– Loadbreak Elbow Connector

– Test Point Cap

– Grounding Wire

– Loadbreak Probe

– Cleaning Tissue

– Silicone Lubricant

– Conductor Cable Lug

– Probe Installation Tool(Optional)

– Installation Instruction Sheet(Optional)

Reviews

There are no reviews yet.

Be the first to review “15kV 200AMP Loadbreak Elbow Connector”

Your email address will not be published. Required fields are marked *

You may also like…